Steeler 57 s in build

Written By:  Michael Miller May 31, 2017 at 12:22 pm

These photos show the latest Steeler 57S being built for a UK client as she is turned onto her keel for the first time in readiness for the superstructure to be fitted.

The next stage is preparation of the hull for painting after which she will be moved to the pre fit out sheds for the start of her internal fit out.

A good job all done by chains and a hoist.
Today will see the superstructure lifted and placed on the hull, then we will start to see the fluid lines of the boat emerge in all their glory.